Skip to main content

Industry News

16 Aug 2022

A Final Look at the Completed 300 N Michigan Avenue in the Loop

A Final Look at the Completed 300 N Michigan Avenue in the Loop
Photo by Jack Crawford

The Loop‘s newest skyscraper, 300 N Michigan Avenue, is now complete. The 47-story mixed-use tower developed by Sterling Bay and Magellan Development Group features a retail base, a 280-key citizenM hotel on the lower levels, and 289 rental apartment units dubbed “Millie on Michigan.”

Apartment sizes include convertibles from 502 to 607 square feet, one-bedrooms from 574 to 802 square feet, and two-bedrooms from 1,088 to 1,134 square feet. Prices begin at $2,539 for convertibles, $2,766 for one-bedrooms, and $4,203 for two-bedrooms.

The hotel and the residences at Millie on Michigan will have access to a shared, fully-outfitted fitness center. The amenity space on the fourth floor of the hotel includes an indoor/outdoor space. The rooftop terraces, facing west down the Chicago River main stem and east toward the lake, offer 360-degree views from 510 feet above the city streets.

The facade on the bKL Architecture-designed tower includes Vision Glass glazing patterned according to the internal programming. The building has a rectilinear shape, with various setbacks and cut-outs. The fourth and fifth floors are set back from Michigan Avenue to allow for the hotel’s open-air amenity terrace. The crown is also set back to allow for the two aforementioned rooftop terraces.

The project is located in the heart of the city and is heavily transit-oriented. There will be 22 on-site bike spaces and 48 bike storage spaces. Bus service for Routes 3, 6, 20, 26, 66, 124, 143, 146, 147, 148, 151, 157, 850, 851, and 855 are all immediately accessible via the adjacent corner of Michigan & South Water. Rail service is available at the Metra’s Millennium station via a four-minute walk southwards while all CTA L trains are accessible within a 10-minute walking radius.

Linn-Mathes Inc served as the general contractor for the $175 million construction. While residential move-ins are now underway, both the retail and hotel components are still undergoing interior build-outs. The citizenM hotel is expected to open on September 21st of this year.

Read more on Chicago YIMBY

 

                                                                                                                        

Attend Chicago Build Expo, the largest construction, design and real estate show for the Midwest. Gain access to 12 conference tracks and AIA CES approved workshops, check out 250+ exhibitors, learn from 350+ high-profile speakers and connect with 20,000+ built environment professionals.

View all Industry News
Loading

SIGN UP TO RECEIVE OUR NEWSLETTER

SPONSORS